Concrete Calculator
Results
Concrete needed
1.36 cubic yards
Includes your waste allowanceWhat to buy
- 80 lb bags62 bags
- 60 lb bags82 bags
- 40 lb bags123 bags
- Ready-mix to orderRounded up to the next ¼ yard. Ask your supplier about short-load fees
- 1.50 yd³
- Cubic feet
- 36.7 ft³
- Cubic meters
- 1.04 m³
- Weight of the concrete neededFor the 1.36 yd³ above, at 150 lb per ft³
- 5,500 lb
- Weight of the ready-mix you orderWhat the truck delivers: the order rounded up to the next ¼ yard, at 150 lb per ft³
- 6,075 lb
- Assumptions used: 10% waste added; bag yields of 0.3, 0.45 and 0.6 ft³ for 40, 60 and 80 lb bags; 150 lb per ft³ for the weight.
- Bag yields used: 0.60 ft³ per 80 lb, 0.45 ft³ per 60 lb, 0.30 ft³ per 40 lb. Check your bag, since brands differ slightly.
- Ready-mix is usually ordered in ¼ yard steps. Round up rather than down.
- In metric: an 80 lb bag is about 36 kg, a 60 lb bag about 27 kg and a 40 lb bag about 18 kg.