Decking for a 4 × 3 m deck, by board width
The deck is 12 m². Narrower boards mean more rows and more boards, and wider gaps mean fewer. These counts include 10% for cuts and use boards of 3.0 m with 5 mm gaps:
| Board width | Rows of boards | Boards to buy | Total length (m) |
|---|---|---|---|
| 144 mm (the usual width) | 21 | 31 | 92.4 |
| 120 mm | 24 | 36 | 105.6 |
| 95 mm | 30 | 44 | 132.0 |
Boards by length you buy
Boards are sold in standard lengths. Pick the length that wastes the least off-cut for your span (144 mm boards):
| Board length | Boards to buy |
|---|---|
| 2.4 m | 39 |
| 3 m | 31 |
| 3.6 m | 26 |
| 4.8 m | 24 |
About a 4 × 3 m deck
This size suits a deck for a dining set and a barbecue. The structure needs about 11 joists at 400 mm centres, with posts or pads, a damp-proof strip on the tops of the joists and good ventilation underneath. A deck more than 300 mm above the ground generally needs planning permission in England. Check with your council. The decking materials calculator adds the joists, posts, screws and tools.
Want to change anything else? The calculator above is the full Decking Calculator (UK): edit any number and the results update instantly.
Tools & materials for this project
Affiliate links As an Amazon Associate we earn from qualifying purchases. These links do not change what you pay.
Frequently asked questions
How many decking boards do I need for a 4m x 3m deck?
A 4 × 3 m deck is 12 m². With 144 mm boards, 5 mm gaps and 10% extra you need 31 boards of 3.0 m (92.4 m of board in total), laid in 21 rows.
How many joists for a 4m x 3m deck?
At 400 mm centres you need about 11 joists. Closer spacing (300 mm) is a good idea for 19 mm boards on a deck that gets heavy use, and wider spacing risks bounce.
How many screws for a 4m x 3m deck?
About 462 decking screws, allowing two per board at every joist crossing plus a margin. Buy a box or two more than the count.
Related sizes and guides
Related sizes
Estimates only. Results assume standard materials and simple shapes. Supplier products vary, and the final call on quantity, structure and safety is yours. Check your local code and your supplier's guidance before ordering.