How Much Sod for 1000 Square Feet?

A 1000 ft² lawn needs about 1,050 ft² of sod with 5% waste, which is 105 rolls of 10 ft² or 2.3 pallets. Use 10% waste for curves.

Jump to your result ↓

Your project

%

Use 5% for simple rectangles and 10% for curved or irregular edges.

Sod is sold in rolls (strips). The size is on the supplier price list; 10 ft² (2 × 5 ft) is the most common.

ft²

Varies by grower, usually 400 to 500 ft². Ask yours.

$

Example only. Check local sod farms.

Results

Example job shown. Change the numbers to match yours.

Sod to order
1,050 ft²
Includes your waste allowance
What to buy
  • Rolls105 rolls
  • Pallets2.3 pallets
Lawn area (no waste)
1,000 ft²

Cost

Estimated cost
$630.00
  • Assumptions used: 5% waste added; 10 ft² per roll and 450 ft² per pallet.
  • Sod is perishable. Lay it the day it is delivered, and have the soil prepared and the area measured before you order.

Before you buy: round up to whole packs, check the size printed on the label, and add a little spare. Your supplier has the final say.

Blueprint

31.6 ft31.6 ft9 of 105 shown

1,050 ft² of sod · 105 rolls

Sod for 1000 square feet, by waste allowance

1000 ft² is about 32 × 32 ft. Rolls are 10 ft² each and pallets about 450 ft².

WasteSod to orderRollsPallets
0% (No waste)1,000 ft²1002.2
5% (Simple shape)1,050 ft²1052.3
10% (Curves and edges)1,100 ft²1102.4
15% (Very irregular)1,150 ft²1152.6

Rough cost

Sod prices vary a lot by region, grass type and delivery. At example prices per square foot, 1,050 ft² costs:

PriceTotal (before delivery)
$0.40 per ft²$420
$0.60 per ft²$630
$0.80 per ft²$840

Getting it laid

Order for delivery on the day you will lay it, since sod is perishable, and prepare the soil first. Lay it in staggered rows, press the seams tight, roll it, and water straight away. See sod vs seed for aftercare.

Laying it and watering it

A square lawn of 1,000 ft² is about 32 × 32 ft: 16 rows of 2 ft wide rolls, with about 7 rolls (5 ft each) in every row. Stagger the seams like brickwork, and start along a straight edge such as a driveway.

New sod needs to stay damp. One inch of water over 1,000 ft² is 623 gallons, and a light watering of a quarter inch is 156 gallons. In the first two weeks that is often needed once or twice a day, less in cool weather. Once the roots have knit into the soil, water deeply and less often.

A typical suburban back lawn

1,000 ft² is the back lawn of a small suburban lot, or a front and side yard together. 105 rolls with 5% waste is more than two pallets of rolls (2.3 pallets), so delivery makes sense, and it matters when it arrives: sod stacked on a pallet starts to heat up in the middle within a day, especially in summer.

Plan the work so the first pallet goes down within hours of arriving and the rest is staged in shade. Two people can lay this in a day. Start along the longest straight edge, work across it without walking on the new rolls (stand on a sheet of plywood), and finish with a roller so the roots touch the soil. Sprinkler coverage is worth checking before you start: a lawn this size is usually two or three sprinkler positions.

Want to change anything else? The calculator above is the full Sod Calculator: edit any number and the results update instantly.

Tools & materials for this project

Affiliate links As an Amazon Associate we earn from qualifying purchases. These links do not change what you pay.

Frequently asked questions

How much sod for 1000 square feet?

Order 1,050 ft² with 5% waste, which is 105 rolls of 10 ft² or about 2.3 pallets. Use 10% waste (1,100 ft²) for curved edges.

How many rolls of sod for 1000 square feet?

105 standard rolls (2 × 5 ft, 10 ft² each) with 5% waste, or 100 with none. Many farms also sell larger rolls and slabs, so check their size.

How many pallets of sod for 1000 square feet?

About 2.3 pallets at 450 ft² per pallet. Pallet coverage varies from 400 to 500 ft², so ask your supplier.

Related sizes and guides

Estimates only. Results assume standard materials and simple shapes. Supplier products vary, and the final call on quantity, structure and safety is yours. Check your local code and your supplier's guidance before ordering.