How Much Sod for 500 Square Feet?

A 500 ft² lawn needs about 525 ft² of sod with 5% waste, which is 53 rolls of 10 ft² or 1.2 pallets. Use 10% waste for curves.

Jump to your result ↓

Your project

%

Use 5% for simple rectangles and 10% for curved or irregular edges.

Sod is sold in rolls (strips). The size is on the supplier price list; 10 ft² (2 × 5 ft) is the most common.

ft²

Varies by grower, usually 400 to 500 ft². Ask yours.

$

Example only. Check local sod farms.

Results

Example job shown. Change the numbers to match yours.

Sod to order
525 ft²
Includes your waste allowance
What to buy
  • Rolls53 rolls
  • Pallets1.2 pallets
Lawn area (no waste)
500 ft²

Cost

Estimated cost
$315.00
  • Assumptions used: 5% waste added; 10 ft² per roll and 450 ft² per pallet.
  • Sod is perishable. Lay it the day it is delivered, and have the soil prepared and the area measured before you order.

Before you buy: round up to whole packs, check the size printed on the label, and add a little spare. Your supplier has the final say.

Blueprint

22.4 ft22.4 ft9 of 53 shown

525 ft² of sod · 53 rolls

Sod for 500 square feet, by waste allowance

500 ft² is about 22 × 22 ft. Rolls are 10 ft² each and pallets about 450 ft².

WasteSod to orderRollsPallets
0% (No waste)500 ft²501.1
5% (Simple shape)525 ft²531.2
10% (Curves and edges)550 ft²551.2
15% (Very irregular)575 ft²581.3

Rough cost

Sod prices vary a lot by region, grass type and delivery. At example prices per square foot, 525 ft² costs:

PriceTotal (before delivery)
$0.40 per ft²$210
$0.60 per ft²$315
$0.80 per ft²$420

Getting it laid

Order for delivery on the day you will lay it, since sod is perishable, and prepare the soil first. Lay it in staggered rows, press the seams tight, roll it, and water straight away. See sod vs seed for aftercare.

Laying it and watering it

A square lawn of 500 ft² is about 22 × 22 ft: 12 rows of 2 ft wide rolls, with about 5 rolls (5 ft each) in every row. Stagger the seams like brickwork, and start along a straight edge such as a driveway.

New sod needs to stay damp. One inch of water over 500 ft² is 312 gallons, and a light watering of a quarter inch is 78 gallons. In the first two weeks that is often needed once or twice a day, less in cool weather. Once the roots have knit into the soil, water deeply and less often.

A small lawn: one afternoon and no pallet

500 ft² is a front yard strip, a townhouse back lawn or a patch you are repairing. With 5% waste you need 53 rolls, which is a little more than one pallet (1.2), so ask the farm or garden center whether they sell by the roll. A pickup with the rolls stacked flat avoids the delivery charge, and a pallet drop for a lawn this small is often not worth it.

One person can lay this much in a few hours. Do the soil first, because that is where a small job is won or lost: rake it level, leave it about an inch below paths and driveways so the sod finishes flush, and wet it lightly before you start. Keep a knife or sharp spade handy, since a small lawn has proportionally more edges to trim than a big one.

Want to change anything else? The calculator above is the full Sod Calculator: edit any number and the results update instantly.

Tools & materials for this project

Affiliate links As an Amazon Associate we earn from qualifying purchases. These links do not change what you pay.

Frequently asked questions

How much sod for 500 square feet?

Order 525 ft² with 5% waste, which is 53 rolls of 10 ft² or about 1.2 pallets. Use 10% waste (550 ft²) for curved edges.

How many rolls of sod for 500 square feet?

53 standard rolls (2 × 5 ft, 10 ft² each) with 5% waste, or 50 with none. Many farms also sell larger rolls and slabs, so check their size.

How many pallets of sod for 500 square feet?

About 1.2 pallets at 450 ft² per pallet. Pallet coverage varies from 400 to 500 ft², so ask your supplier.

Related sizes and guides

Estimates only. Results assume standard materials and simple shapes. Supplier products vary, and the final call on quantity, structure and safety is yours. Check your local code and your supplier's guidance before ordering.