Driveway and Path Edging Calculator (UK): Units and Haunching

Enter the length of edging, the length of one unit and the size of the concrete bed and haunching behind it. You get the units to buy, the concrete in m³ and the bags of cement, sand and gravel if you mix it yourself.

UK edition. Switch to the US edition for feet, inches and US gallons.

Jump to your result ↓

Your project

Along the edge, including the curves.

Use the length on the label or the invoice. Setts and blocks are shorter, and kerb-style units are longer.

The thickness of the edging across the edge.

How far up the back of the unit the concrete goes. It is usually no higher than the paving.

%

Uneven ground, spillage and cut units at the ends.

Results

Example job shown. Change the numbers to match yours.

Edging units to buy
11 units
1,000 mm each, with 5% extra
What to buy
  • Bags of cement (25 kg)4 bags
Concrete for the bed and haunching30,000 cm² a metre run along 10.0 m
0.32 m³

If you mix it yourself (1 : 2 : 4)

Bags of cement (25 kg)
4 bags
Sharp sand0.14 m³
0.22 tonnes
20 mm aggregate (gravel)0.28 m³
0.42 tonnes
  • Assumptions used: 5% waste added; a concrete bed 100 mm deep under the unit and 100 mm wide haunching behind; 1 : 2 : 4 by volume, dry factor 1.54, cement 1440 kg/m³, sharp sand 1.6 and aggregate 1.5 tonnes/m³, 25 kg bags.
  • Edging is bedded in concrete on a compacted sub-base and haunched at the back so that it cannot move when the paving or the drive loads it. The bed is as wide as the unit plus the haunching. A drive takes much more load than a path, so use a deeper bed and a wider haunch for it. The sizes are inputs because they depend on the product and the ground: follow the maker's instructions. Ready-mix is the better buy above about 0.5 m³.

Before you buy: round up to whole packs, check the size printed on the label, and add a little spare. Your supplier has the final say.

How this calculator works

Edging units sit on a bed of concrete and are held by a wedge of concrete (haunching) behind. The units are a division: the length of the edge, with a margin for cuts, divided by the length of one unit, rounded up. The concrete is the cross-section of the bed and the haunch, multiplied by the length. The cross-section is the bed (as wide as the unit plus the haunch, by its depth) plus the haunch (its width by its height).

units = ⌈length × (1 + waste %) ÷ unit length⌉ m³ = length × ((unit width + haunch width) × bed depth + haunch width × haunch height) × (1 + waste %)

Worked example: 10 m of edging with 1 m units is 11 units with 5% extra. The cross-section is 300 cm² (an area of 0.03 m²) so the concrete is 0.32 m³. Mixed 1 : 2 : 4 by volume that is 4 bags of cement, 0.22 tonnes of sharp sand and 0.42 tonnes of aggregate. A 30 m run takes 32 units and 0.95 m³, and a 150 mm bed raises the 10 m job to 0.11 m³.

Assumptions and sources
  • Assumptions used: 5% waste added; a concrete bed 100 mm deep under the unit and 100 mm wide haunching behind; 1 : 2 : 4 by volume, dry factor 1.54, cement 1440 kg/m³, sharp sand 1.6 and aggregate 1.5 tonnes/m³, 25 kg bags.
  • Edging is bedded in concrete on a compacted sub-base and haunched at the back so that it cannot move when the paving or the drive loads it. The bed is as wide as the unit plus the haunching. A drive takes much more load than a path, so use a deeper bed and a wider haunch for it. The sizes are inputs because they depend on the product and the ground: follow the maker's instructions. Ready-mix is the better buy above about 0.5 m³.

The formula and a worked example are shown above, so you can check any result by hand. Read how we calculate and check our numbers. Results are estimates for planning: supplier products vary, so check the size printed on the label.

Edging for common jobs

1 m units, 100 mm bed, 100 × 100 mm haunching, 5% extra.

Edging lengthUnitsConcreteCement bags
5 m60.16 m³2
10 m110.32 m³4
20 m210.63 m³8
30 m320.95 m³12
50 m531.58 m³20

Tips before you buy

  • Set the edging first, then lay the paving or the drive up to it: the edging fixes the finished level, so string a line along the top.
  • Let the concrete go off for a day or two before you load the edge or compact against it.
  • Mix the concrete fairly dry so that it holds its shape as haunching and does not slump away from the unit.
  • Cut units with a disc cutter or a bolster and leave a gap of a few millimetres at each joint for the concrete to key into.
  • Lay a first row without mortar to see where the cuts fall, so the last unit is not a sliver.

Tools & materials for this project

Affiliate links As an Amazon Associate we earn from qualifying purchases. These links do not change what you pay.

Frequently asked questions

How many edging units do I need?

Divide the length of the edge by the length of one unit and add about 5% for cuts. 10 m of edging with 1 m units takes 11.

How much concrete do I need to bed and haunch edging?

With a 100 mm bed under the unit and a 100 × 100 mm haunch behind it, 10 m of edging takes 0.32 m³, including 5% extra.

What is haunching?

A wedge of concrete along the back of the edging units that stops them from leaning or moving when the paving or the drive is loaded.

How much cement do I need for 10 m of edging?

4 bags of 25 kg in a 1 : 2 : 4 mix, with 0.22 tonnes of sharp sand and 0.42 tonnes of gravel.

Do I need a deeper bed for a driveway?

A drive carries cars, so use a deeper bed and wider haunching than for a path. Check the edging maker's instructions and use the concrete calculator for the size you pick.

Add this calculator to your website

Running a blog, a contractor site or a class page? You can put this calculator on it for free. Copy the code below, and please leave the link underneath the calculator in place. The small script just resizes the frame to fit the results; if your site strips scripts, the calculator still works inside a scrolling frame.

Get the embed code

Related calculators & guides

Estimates only. Results assume standard materials and simple shapes. Supplier products vary, and the final call on quantity, structure and safety is yours. Check your local code and your supplier's guidance before ordering.