Block Paving Calculator (UK)

Enter the size of the drive or patio and the block you are using. You get the blocks to buy, the tonnes of MOT Type 1 for the sub-base and the sand for the laying course.

UK edition. In Canada or the US? Switch to the US and Canada edition for feet, inches and US gallons.

Jump to your result ↓

Your project

A layer of grit or sharp sand, screeded level. It compacts to about 30 mm.

%

Cuts at the edges. 5% for a simple rectangle, and 10 to 15% for curves or a herringbone pattern.

Results

Example job shown. Change the numbers to match yours.

Blocks to buy
1,507 blocks
47.8 blocks per m², before your cutting allowance
What to buy
  • Blocks per m²47.8 blocks
  • Bulk bags of 0.8 tonnes13 bags
Area
30.0 m²

Sub-base

MOT Type 1 sub-base4.73 m³ compacted, with 5% extra
10.40 tonnes

Laying course

Grit or sharp sandWith 5% extra
2.02 tonnes
Edge restraint, if all four sides are free
22.0 m
  • Block paving needs a firm edge restraint (a kerb or an edging bedded in concrete) on every free side, or the blocks will spread. MOT Type 1 weighs about 2.2 tonnes per m³ once compacted, and the sand about 1.6. Jointing sand is swept in after compaction: check the coverage on the bag.

Before you buy: round up to whole packs, check the size printed on the label, and add a little spare. Your supplier has the final say.

Blueprint

1,507 blocks12 of 1,507 shown200 × 100 mm block

1,507 blocks · 12 drawn

How this calculator works

Each block covers its own size plus one joint, so the blocks needed are the area, plus your cutting allowance, divided by the area of one block with its joint. For the standard 200 × 100 mm block with 3 mm joints that is about 48 per square metre. Under the blocks go a compacted sub-base of MOT Type 1 and a laying course of sand.

blocks = area × (1 + waste %) ÷ ((length + joint) × (width + joint))MOT Type 1 (tonnes) = area × depth (m) × 2.2 × 1.05

Worked example: a 6 × 5 m drive (30 m²) in 200 × 100 mm blocks with 3 mm joints and 5% for cuts: each block with its joint covers 0.203 × 0.103 = 0.0209 m², which is 47.8 blocks per m², so you need 30 × 1.05 × 47.8 = 1,507 blocks. A 150 mm sub-base takes 30 × 0.15 × 2.2 × 1.05 = 10.4 tonnes of MOT Type 1, and a 40 mm laying course 2.0 tonnes of sand.

Assumptions and sources

The assumptions behind your numbers (waste, sizes, rates) are listed in the notes directly under your results, and they update when you change an input.

The formula and a worked example are shown above, so you can check any result by hand. Read how we calculate and check our numbers. Results are estimates for planning: supplier products vary, so check the size printed on the label.

Materials for common drive sizes (200 × 100 mm blocks, 3 mm joints, 5% waste)

150 mm sub-base and a 40 mm laying course.

Drive sizeAreaBlocksMOT Type 1Laying sand
3 × 5 m15 m²7545.2 tonnes1.0 tonnes
3 × 10 m30 m²1,50710.4 tonnes2.0 tonnes
5 × 5 m25 m²1,2568.7 tonnes1.7 tonnes
6 × 5 m30 m²1,50710.4 tonnes2.0 tonnes
6 × 8 m48 m²2,41116.6 tonnes3.2 tonnes

Tips before you buy

  • Use blocks that are 60 mm thick for a drive that carries cars, and 80 mm where heavy vehicles go. 50 mm blocks are for patios and paths.
  • Compact the MOT Type 1 in layers of about 100 mm with a plate compactor. A poor sub-base is the main reason block paving sinks and ruts.
  • Screed the laying course to an even depth, and do not walk on it before the blocks go down. Compact the finished surface with a plate compactor fitted with a rubber pad, then sweep jointing sand into the gaps and compact again.
  • Give a drive a fall of about 1 in 60 so water runs off, and in England remember that a paved front garden over 5 m² needs permeable paving or drainage to a lawn or border, otherwise it needs planning permission.
  • Mix blocks from several packs as you lay, to blend any colour differences.
  • Check for buried services before you dig, using the free LSBUD service.

Tools & materials for this project

Affiliate links As an Amazon Associate we earn from qualifying purchases. These links do not change what you pay.

Frequently asked questions

How many block paving bricks per square metre?

About 48 for the standard 200 × 100 mm block with 3 mm joints, and around 50 if the blocks have no spacer gap. Add 5 to 10% for cuts.

How many blocks do I need for a 6m x 5m drive?

About 1,507 blocks of 200 × 100 mm with 5% for cuts. That is 30 m² at 47.8 blocks per m².

How deep should the sub-base be for block paving?

150 mm of compacted MOT Type 1 for a driveway, and 100 mm for a patio or path. On soft ground, go deeper.

What sand do I use under block paving?

A laying course of grit or sharp sand about 30 to 50 mm deep, screeded level. Do not use building sand, which holds water and will not drain.

Add this calculator to your website

Running a blog, a contractor site or a class page? You can put this calculator on it for free. Copy the code below, and please leave the link underneath the calculator in place. The small script just resizes the frame to fit the results; if your site strips scripts, the calculator still works inside a scrolling frame.

Get the embed code

Related calculators & guides

Estimates only. Results assume standard materials and simple shapes. Supplier products vary, and the final call on quantity, structure and safety is yours. Check the Building Regulations and your supplier's guidance before ordering.