Planning a patio or paved area

A patio looks like a flat surface, but it is mostly what is underneath: a compacted sub-base, a bedding layer and a fall that sends the water away. Slabs laid on a thin or soft base rock, sink and crack. Time spent on the levels and the sub-base is time not spent re-laying it.

This planner follows the order of work. The same steps cover a patio, a path and a base for a shed or a hot tub, with a thicker base for anything heavy.

Step 1: Decide the size, the position and the levels

Mark the area with pegs and string, and put your table and chairs inside it. Work out the finished level: it must stay at least 150 mm below the damp-proof course of the house, and fall away from the building so that rain runs off. A fall of about 1 in 80 (roughly 12 mm for every metre) is a common aim.

Step 2: Dig out and build the sub-base

Dig out to the depth of the slab, the bedding and the sub-base, remove topsoil and soft spots, and compact what is left. The sub-base is usually MOT Type 1 crushed stone, laid in layers and compacted with a plate compactor. A patio needs about 100 mm, and anything that carries vehicles needs more. Check for buried cables and pipes before you dig.

Step 3: Work out the whole shopping list

The patio calculator gives the slabs with an allowance for cuts, the sub-base, the sharp sand and cement for the bed, and the pointing mix. Slabs are sold by the pack or the pallet, so order a few spares from the same batch, since colours vary.

Step 4: Lay the slabs

Lay slabs on a full bed of mortar or on a bed of sharp sand with a mortar spot, working from a straight edge and checking the fall with a level and a spacer. Tap each slab down, keep the joints even, and cut the edge slabs last with a saw or a cutter. Lay on a dry day, and keep off the slabs while the mortar sets.

Step 5: Point, clean and seal

Fill the joints with a pointing mortar or a jointing compound, brush off the surplus before it sets, and clean the patio once the mortar has cured. A sealer is optional and helps against staining on porous slabs.

Before you start

  • The finished level against the damp-proof course, and the fall away from the house.
  • Planning rules in a conservation area or where the patio is in the front garden: paving more than 5 square metres of a front garden with a non-porous surface needs permission in England unless the water drains to a permeable area.
  • Services under the ground, and the position of drains and manholes.
  • Delivery and storage of heavy packs of slabs.
  • A plate compactor and a slab cutter, hired for the weekend.

Mistakes that cost people money

  • A sub-base that is too thin or not compacted, so the slabs sink and rock.
  • Laying the patio too high, bridging the damp-proof course.
  • No fall, so water pools against the house.
  • Laying slabs on dabs of mortar with gaps underneath, which crack when stood on.
  • Ordering exactly the area with no allowance for cuts.

Frequently asked questions

How deep should the sub-base for a patio be?

About 100 mm of compacted MOT Type 1 for a patio, and 150 mm or more for a driveway or a base that carries heavy loads. The patio calculator includes the sub-base.

How much fall should a patio have?

A fall of about 1 in 80 (around 12 mm per metre) away from the house is a common aim, so that rain runs off the surface.

Do I need planning permission for a patio?

Usually not for a patio at the back, though it may be restricted in conservation areas or where a property has special rules. Paving most of a front garden with a non-porous surface is controlled.

Should I use sand or mortar under slabs?

A full bed of mortar is stronger and more stable for heavy use, and sharp sand with spots of mortar is common for patios. Follow the slab maker's advice.

Related projects

Tools & materials for this project

As an Amazon Associate we earn from qualifying purchases. These links do not change what you pay.

Estimates only. Quantities depend on your materials, site and supplier. Check the Building Regulations and any planning rules for anything structural or close to a boundary, and use a registered electrician or gas engineer for that work.