How Many Paving Slabs for a 7x5 Shed Base?

A 7 × 5 ft shed needs a base of about 2.1 × 1.5 m (3.15 m²). That is 3.5 by 2.5 slabs of 600 × 600 mm, so buy 10 slabs and cut one row each way. Lay them on 0.73 tonnes of compacted MOT Type 1 and 0.16 tonnes of sharp sand.

Jump to your result ↓

Your project

%

Cuts and breakage. Use 10% for a simple rectangle, more for curves and angles.

Results

Example job shown. Change the numbers to match yours.

Paving slabs to buy
10 slabs
2.69 slabs per m², before your cutting allowance
Area
3.2 m²

Sub-base

MOT Type 1 sub-base0.33 m³ compacted, or 1 bulk bag of 0.8 tonnes, with 5% extra
0.73 tonnes

Bedding sand

Sharp sand0.10 m³ at 1.6 tonnes/m³ (sand weight varies with moisture; the gravel calculator uses 1.7), with 5% extra
0.16 tonnes
  • Assumptions used: 10% waste added; 10 mm joints; MOT Type 1 at 2.2 tonnes/m³ compacted; 5% extra on the sub-base and bed; a 30 mm sharp sand bed with sand at 1.6 tonnes/m³.
  • MOT Type 1 weighs about 2.2 tonnes per m³ once compacted, so 100 mm needs about 0.22 tonnes per m². Quantities include 5% extra for the sub-base and the bed. The mortar figures are approximate: allow for the dry materials being about 1.3 times the wet volume of the mortar.

Blueprint

10 slabs600 × 600 mm slab

10 slabs

Slabs for a 7 × 5 ft shed base, by slab size

A 7 × 5 ft shed is a store with room for a potting bench or the garden furniture over winter. The base here is 2.1 × 1.5 m, converted at 0.3 m per foot, which leaves it marginally smaller than the shed floor as most shed makers ask (check your shed's instructions). The layout column shows where whole slabs fit with tight joints; the last column is the paving calculator's count with 10 mm joints and 10% for cuts and breakage.

Slab sizeLayoutSlabs by areaSlabs to buy
600 × 600 mmNeeds cuts910
450 × 450 mmNeeds cuts1617
400 × 400 mmNeeds cuts2021
300 × 300 mm7 × 5, no cuts3537
600 × 300 mmNeeds cuts1819
900 × 600 mmNeeds cuts67

A size that 600 mm slabs do not divide into

A 2.1 × 1.5 m base is three and a half slabs by two and a half, so one row each way has to be cut. Counted by area it is 9 slabs if every offcut is used, and the calculator's 10 with 10 mm joints and 10% extra gives you a slab in hand for a cut that goes wrong.

If you would rather not cut, 300 × 300 mm slabs fit this base exactly: 7 by 5, which is 35 slabs. Small slabs have more joints to keep level, so take extra care screeding the bed flat.

Sub-base and bed for 2.1 × 1.5 m

LayerQuantity
MOT Type 1 sub-base, 100 mm0.73 tonnes
MOT Type 1 sub-base, 150 mm (soft ground)1.09 tonnes
Sharp sand for a 30 mm sand bed0.16 tonnes
Or a 40 mm mortar bed at 6:10.24 tonnes of sharp sand and 2 bags of 25 kg cement

Quantities include 5% extra. Check for buried services before you dig, using the free LSBUD service. Shed base options compared weighs slabs against concrete, a plastic grid and a timber frame, and the concrete version of this base is on how much concrete for a 7 × 5 ft shed base.

Want to change anything else? The calculator above is the full Paving Slab Calculator (UK): edit any number and the results update instantly.

Tools & materials for this project

Affiliate links As an Amazon Associate we earn from qualifying purchases. These links do not change what you pay.

Frequently asked questions

How many slabs do I need for a 7x5 shed base?

10 slabs of 600 × 600 mm, with some cut. The 2.1 × 1.5 m base is 3.15 m², which is 9 slabs by area, and the extra covers 10 mm joints and 10% for cuts and breakage.

What goes under the slabs for a 7x5 shed base?

About 100 mm of compacted MOT Type 1 (0.73 tonnes for this base) and a 30 mm bed of sharp sand (0.16 tonnes). On soft ground use 150 mm of sub-base, which is 1.09 tonnes.

Do I have to cut slabs for a 7x5 shed base?

With 600 × 600 mm slabs, yes: the 2.1 × 1.5 m base is 3.5 by 2.5 slabs, so allow 10. With 300 × 300 mm slabs it is exactly 7 by 5 (35 slabs) with tight joints and no cuts.