Shed Base Options UK: Concrete vs Slabs vs Plastic Grid vs Timber

The short answer

For most garden sheds, a base of paving slabs on a compacted sub-base is the best balance of cost, effort and life. Choose a concrete slab for a heavy shed or workshop, a plastic grid filled with gravel for a light shed on level ground, and a timber frame on concrete pads on a slope. For an 8 × 6 ft shed (about 2.4 × 1.8 m) that means 0.48 m³ of concrete, 13 paving slabs, 4.32 m² of grid or 7 joists, as the table below shows.

Shed Base Materials Calculator (UK)Concrete, cement, sand, aggregate and MOT Type 1 for a shed base.
Open calculator

The four shed bases compared, for an 8 × 6 ft shed

BaseWhat you need for 2.4 × 1.8 mBest forWatch out for
Concrete slab0.48 m³ of concrete (7 bags of 25 kg cement if you mix 1:2:4), on 1.05 tonnes of MOT Type 1Heavy sheds, workshops, log cabins, sheds you will keep for decadesMost work and the most digging; needs a few days to harden; permanent
Paving slabs13 slabs of 600 × 600 mm on 1.00 tonnes of MOT Type 1 and 0.22 tonnes of sharp sandMost timber and metal sheds on firm, level groundSlabs can rock or sink if the sub-base is skimped
Plastic grid and gravel4.32 m² of grid filled with 0.29 tonnes of gravel (for a grid 40 mm deep)Light sheds on fairly level ground, where you want a quick, free-draining baseLess rigid than a slab; follow the grid maker on load and sub-base
Timber frame on pads7 joists of 1.8 m at 400 mm centres, on 6 concrete pads (238 litres of concrete in all)Sloping ground, or where you cannot dig a slabTimber must be treated for ground contact; the frame must be square and level

Whichever you choose, check the shed maker's instructions first: many give the base size and the type of base the guarantee needs. Most want the base the same size as the floor, or a little smaller, so that rain runs off rather than pooling under the walls.

1. A concrete slab

A 100 mm slab of 2.4 × 1.8 m takes 0.48 m³ of concrete with 10% extra, so order 0.50 m³ of ready-mix, or mix it yourself from 7 bags of 25 kg cement, 0.33 tonnes of sharp sand and 0.63 tonnes of 20 mm aggregate. Under it goes 1.05 tonnes of MOT Type 1, 5.2 m² of damp-proof membrane if you use one, and 8.4 m of timber for the shuttering (figures from the shed base calculator).

It is the strongest and longest-lasting base, and the only sensible choice for a brick or concrete building. It is also the most work: a deeper dig, mixing or a ready-mix delivery, and a wait of a few days before you build on it. The full list, with the mix and the method, is in the concrete shed base materials list.

2. Paving slabs

An 8 × 6 ft base is exactly 4 × 3 slabs of 600 × 600 mm when they are butted together, so 12 slabs cover it with no cuts. The paving calculator says 13 with 10 mm joints and 10% spare, which gives you one to replace a broken slab. Under them goes 1.00 tonnes of MOT Type 1 at 100 mm and 0.22 tonnes of sharp sand for a 30 mm bed. For a firmer base, lay the slabs on a full mortar bed instead: 0.32 tonnes of sharp sand and 2 bags of cement.

Slabs suit most timber and metal sheds. The weak point is the ground beneath them: a slab laid on soil, or on a thin sub-base, rocks and sinks unevenly, and the shed door then binds. Compact the sub-base well and check each slab with a level.

3. A plastic grid filled with gravel

Plastic shed base grids clip together into a mat that you lay on levelled ground over a weed membrane and fill with gravel. For 2.4 × 1.8 m you need 4.32 m² of grid, and for a grid 40 mm deep about 0.29 tonnes of 10 to 20 mm gravel to fill it (0.18 m³, or about 12 bags of 25 kg), from the gravel calculator. The plastic walls of the cells take up some of that volume, so this is on the generous side. Grids are sold in different depths, so use the depth of the one you buy.

It is the quickest base to lay, needs no concrete and drains freely, which helps keep the shed floor dry. It is less rigid than a slab, so on soft ground some grid makers ask for a compacted sub-base first: 50 mm of MOT Type 1 for this size is about 0.52 tonnes. Check the load the grid is rated for before you put a heavy shed or a workshop full of tools on it.

4. A timber frame on piers or concrete pads

On sloping ground, a frame of treated timber joists on concrete pads saves digging out a level platform. For 2.4 × 1.8 m with joists at 400 mm centres you need 7 joists, each 1.8 m long, plus the timber round the edge. Six pads of 300 × 300 mm, 400 mm deep take 238 litres of concrete, or 4 bags of 25 kg cement mixed 1:2:4 (from the decking calculator, which works out the same frame and pads).

Use timber treated for ground contact (often labelled UC4 or Use Class 4), and keep it off the soil where you can, so that it does not stay wet. The joist size and the number of pads depend on the weight of the shed and how far the joists span, so check the shed maker's advice. A frame needs care to get square and level, but once it is, the shed floor stays dry with air moving underneath.

Materials for other shed sizes

The main quantity for each type of base, with the same assumptions as above (100 mm concrete with 10% extra, 600 × 600 mm slabs with 10 mm joints and 10% spare on 100 mm of MOT Type 1, gravel to fill a 40 mm grid, joists at 400 mm centres):

Shed sizeConcretePaving slabsMOT under slabsGravel for a gridJoists
6 × 4 ft (1.8 × 1.2 m)0.24 m³70.50 t0.15 t6 × 1.2 m
8 × 6 ft (2.4 × 1.8 m)0.48 m³131.00 t0.29 t7 × 1.8 m
10 × 8 ft (3 × 2.4 m)0.79 m³221.66 t0.48 t9 × 2.4 m
12 × 8 ft (3.6 × 2.4 m)0.95 m³262.00 t0.58 t10 × 2.4 m

A 12 × 8 ft shed is about the size where the effort of a concrete slab starts to pay off: 0.95 m³ of concrete against 26 slabs on 2.00 tonnes of sub-base. For the concrete for one size in detail, see the shed base pages from 6 × 4 and 8 × 6 to 12 × 8 and 14 × 10 ft.

How to choose

  • Heavy shed, workshop or log cabin: a concrete slab, or slabs on a mortar bed.
  • Ordinary timber or metal shed on level ground: paving slabs on a compacted sub-base.
  • Light shed and a quick job: a plastic grid with gravel, on well-levelled, firm ground.
  • Sloping or awkward ground: a timber frame on concrete pads, or adjustable supports made for the job.
  • Renting, or may move the shed: slabs, a grid or a frame can all be lifted later; a concrete slab cannot.

For the whole job, from choosing the size to the felt on the roof, see the garden, decking, fencing and sheds planner.

Frequently asked questions

What is the best base for a shed in the UK?

For most sheds, paving slabs on a compacted sub-base: 13 slabs of 600 × 600 mm and 1.00 tonnes of MOT Type 1 for an 8 × 6 ft shed. Use concrete for a heavy shed or workshop, and follow the shed maker's instructions.

Can I put a shed on a plastic base?

Yes, a plastic grid filled with gravel suits a light shed on firm, level ground. An 8 × 6 ft shed needs 4.32 m² of grid and about 0.29 tonnes of gravel to fill a grid 40 mm deep. Check the load rating for a heavy shed.

How many paving slabs for an 8x6 shed base?

12 slabs of 600 × 600 mm, laid 4 × 3 and butted together. With joints and a spare allowance, buy 13.

Is a concrete shed base better than slabs?

It is stronger and lasts longer, but it is more work: 0.48 m³ of concrete for an 8 × 6 ft base against 13 slabs. For an ordinary garden shed, well-laid slabs do the job.

Paving Slab Calculator (UK)Slabs, MOT Type 1 sub-base and sand or mortar for a patio.
Open calculator
Gravel & Aggregate Calculator (UK)Tonnes, m³ and bulk bags of gravel, chippings, sand or MOT Type 1.
Open calculator
Decking Calculator (UK)Decking boards, joists and screws for a garden deck.
Open calculator
Concrete Calculator (UK, m³)Cubic metres of concrete for a slab, base or footing, with the DIY mix.
Open calculator
Shed Base Materials Calculator (UK)Concrete, cement, sand, aggregate and MOT Type 1 for a shed base.
Open calculator

More guides

Tools & materials for this project

Affiliate links As an Amazon Associate we earn from qualifying purchases. These links do not change what you pay.

Estimates only. Quantities depend on your materials, site and supplier. Confirm important numbers before you order, and check the Building Regulations and any planning rules for anything structural or close to a boundary.

Open the calculator →