How Many Paving Slabs for a 6x4 Shed Base?

A 6 × 4 ft shed needs a base of about 1.8 × 1.2 m (2.16 m²), which is exactly 6 paving slabs of 600 × 600 mm laid 3 by 2 with tight joints and no cuts. Buy 7 to have 1 spare. Lay them on 0.50 tonnes of compacted MOT Type 1 and 0.11 tonnes of sharp sand.

Jump to your result ↓

Your project

%

Cuts and breakage. Use 10% for a simple rectangle, more for curves and angles.

Results

Example job shown. Change the numbers to match yours.

Paving slabs to buy
7 slabs
2.69 slabs per m², before your cutting allowance
Area
2.2 m²

Sub-base

MOT Type 1 sub-base0.23 m³ compacted, or 1 bulk bag of 0.8 tonnes, with 5% extra
0.50 tonnes

Bedding sand

Sharp sand0.07 m³ at 1.6 tonnes/m³ (sand weight varies with moisture; the gravel calculator uses 1.7), with 5% extra
0.11 tonnes
  • Assumptions used: 10% waste added; 10 mm joints; MOT Type 1 at 2.2 tonnes/m³ compacted; 5% extra on the sub-base and bed; a 30 mm sharp sand bed with sand at 1.6 tonnes/m³.
  • MOT Type 1 weighs about 2.2 tonnes per m³ once compacted, so 100 mm needs about 0.22 tonnes per m². Quantities include 5% extra for the sub-base and the bed. The mortar figures are approximate: allow for the dry materials being about 1.3 times the wet volume of the mortar.

Blueprint

7 slabs600 × 600 mm slab

7 slabs

Slabs for a 6 × 4 ft shed base, by slab size

A 6 × 4 ft shed is the small garden store for tools, a mower and a couple of bikes. The base here is 1.8 × 1.2 m, converted at 0.3 m per foot, which leaves it marginally smaller than the shed floor as most shed makers ask (check your shed's instructions). The layout column shows where whole slabs fit with tight joints; the last column is the paving calculator's count with 10 mm joints and 10% for cuts and breakage.

Slab sizeLayoutSlabs by areaSlabs to buy
600 × 600 mm3 × 2, no cuts67
450 × 450 mmNeeds cuts1112
400 × 400 mmNeeds cuts1415
300 × 300 mm6 × 4, no cuts2425
600 × 300 mm3 × 4, no cuts1213
900 × 600 mm2 × 2, no cuts45

Six slabs: the smallest slab base

Three slabs along and two across is the whole base, so there is nothing to cut and very little to carry: 6 slabs, with 1 more if you buy the calculator's 7 to have a spare. The sub-base is 0.50 tonnes of MOT Type 1, which is 1 bulk bag of 0.8 tonnes, and the bed is 0.11 tonnes of sharp sand.

The same base in concrete is 0.24 m³, mixed from 4 bags of cement. At this size the slabs are usually the quicker job, because nothing has to be shuttered or left to harden.

Sub-base and bed for 1.8 × 1.2 m

LayerQuantity
MOT Type 1 sub-base, 100 mm0.50 tonnes
MOT Type 1 sub-base, 150 mm (soft ground)0.75 tonnes
Sharp sand for a 30 mm sand bed0.11 tonnes
Or a 40 mm mortar bed at 6:10.16 tonnes of sharp sand and 1 bag of 25 kg cement

Quantities include 5% extra. Check for buried services before you dig, using the free LSBUD service. Shed base options compared weighs slabs against concrete, a plastic grid and a timber frame, and the concrete version of this base is on how much concrete for a 6 × 4 ft shed base.

Want to change anything else? The calculator above is the full Paving Slab Calculator (UK): edit any number and the results update instantly.

Tools & materials for this project

Affiliate links As an Amazon Associate we earn from qualifying purchases. These links do not change what you pay.

Frequently asked questions

How many slabs do I need for a 6x4 shed base?

6 slabs of 600 × 600 mm, laid 3 by 2, cover the 1.8 × 1.2 m base with tight joints and no cuts. Buy 7 to have 1 spare; that is the paving calculator's count with 10 mm joints and 10% extra.

What goes under the slabs for a 6x4 shed base?

About 100 mm of compacted MOT Type 1 (0.50 tonnes for this base) and a 30 mm bed of sharp sand (0.11 tonnes). On soft ground use 150 mm of sub-base, which is 0.75 tonnes.

Is a 6x4 shed base better in slabs or concrete?

Either works. Slabs need 6 of 600 × 600 mm on 0.50 tonnes of MOT Type 1; concrete needs 0.24 m³ (4 bags of cement if you mix it). Slabs can be laid and used the same day.

Related sizes and guides

Estimates only. Results assume standard materials and simple shapes. Supplier products vary, and the final call on quantity, structure and safety is yours. Check the Building Regulations and your supplier's guidance before ordering.