Loft Insulation Calculator (UK)

Topping up a 35 m² loft from 100 mm to 270 mm means adding 170 mm of insulation: 8 rolls of 100 mm laid in layers, or 8 rolls of 170 mm laid across the joists. Enter your loft below for your own count.

UK edition. Looking for the US equivalent (feet, inches and US gallons)? Use the US version.

Jump to your result ↓

Your project

0 if there is none. Measure the depth with a ruler.

You can lay several layers, for example 100 mm between the joists and 170 mm across them.

m²

Printed on the pack. Leave at 0 to use a typical value: about 8.2 m² for a 100 mm roll, and proportionally less for thicker ones.

%

Cuts around the joists and pipes. 5 to 10% is typical.

Results

Example job shown. Change the numbers to match yours.

Rolls to buy
8 rolls
100 mm rolls of 8.2 m² each
Depth to addTarget 270 mm less the 100 mm already there
170 mm
Insulation to lay, as m² of the roll thickness
62.5 m²
Loft floor area
35.0 m²
Coverage of one roll
8.2 m²
  • Rolls are compressed in the pack, so a thicker roll covers proportionally less: the 100 mm and 170 mm rolls of one brand cover about 8.2 and 4.8 m². Use the figure printed on your pack. If you already have 270 mm or more, there is nothing to add.

Before you buy: round up to whole packs, check the size printed on the label, and add a little spare. Your supplier has the final say.

How this calculator works

Work out how many millimetres you still need, which is the depth you want less the depth you have. Multiply that by the loft area to get the volume to fill, then divide by the thickness of the roll to find how many square metres of roll you must lay, and by the coverage of one roll to get the number of rolls. We add an allowance for cuts.

rolls = ⌈area × (target − existing) ÷ roll thickness × (1 + waste %) ÷ coverage per roll⌉

Worked example: a 7 × 5 m loft (35 m²) with 100 mm already down, topped up to 270 mm with 100 mm rolls: you need to add 170 mm. That is 35 × 170 ÷ 100 = 59.5 m² of 100 mm roll, 62.5 m² with 5% for cuts. A 100 mm roll covers about 8.2 m², so you need 8 rolls (7.6 rounded up).

Assumptions and sources
  • Rolls are compressed in the pack, so a thicker roll covers proportionally less: the 100 mm and 170 mm rolls of one brand cover about 8.2 and 4.8 m². Use the figure printed on your pack. If you already have 270 mm or more, there is nothing to add.

The formula and a worked example are shown above, so you can check any result by hand. Read how we calculate and check our numbers. Results are estimates for planning: supplier products vary, so check the size printed on the label.

Rolls to top up to 270 mm (35 m² loft, 5% for cuts, typical roll coverage)

By the depth already there. A thicker roll covers proportionally less, so the number of rolls is about the same whatever thickness you buy.

Insulation already thereDepth to addRolls to buy
None270 mm13
50 mm220 mm10
100 mm170 mm8
150 mm120 mm6
200 mm70 mm4

Tips before you buy

  • About 270 mm of mineral wool is the usual recommendation for a loft in the UK. Deeper is better, but there are diminishing returns, and 300 mm is a sensible limit if you need the space for storage.
  • Lay the first layer between the joists and the second across them, which covers the joists and reduces the heat lost through the timber.
  • Do not squash the insulation: it works by trapping air, and compressed wool insulates less.
  • Leave the eaves clear so that air can flow in, and keep insulation away from recessed downlights unless they are rated for it, and from cables that carry a heavy load, which can overheat.
  • Do not insulate under the cold water tank, so that heat from the room below keeps it from freezing, but do insulate the tank itself and the pipes.
  • Wear gloves, a mask and long sleeves, and step only on the joists. A grant or a free scheme may be available: check what applies in your area.

Quick answers by size

Tools & materials for this project

Affiliate links As an Amazon Associate we earn from qualifying purchases. These links do not change what you pay.

Frequently asked questions

How thick should loft insulation be?

The usual recommendation for mineral wool in the UK is 270 mm. Many older homes have less than 100 mm, and topping up is one of the cheapest ways to cut heating bills.

How many rolls of loft insulation do I need for a 35 m² loft?

To go from 100 mm to 270 mm you need about 8 rolls of 100 mm insulation, allowing 5% for cuts. If the loft has none, 270 mm takes about 13 rolls of 100 mm.

Can I put new loft insulation on top of old?

Usually yes: lay the new layer across the joists on top of the old, provided the old insulation is dry and in good condition. Do not use a vapour barrier between the layers.

Do I need to leave gaps in loft insulation?

Leave the eaves clear so that the roof can ventilate, and keep insulation away from downlights, cable bundles and flues unless the product and the fitting are rated for it.

How many rolls of loft insulation do I need for an empty loft?

For a 35 m² loft with no insulation, reaching 270 mm takes 13 rolls of 100 mm. Most people lay 100 mm between the joists and a thicker layer across them; see the loft insulation guide.

Can I still board my loft after adding insulation?

Not directly on top of 270 mm, because boards squash it. Raise the floor on loft legs first; the loft boards guide counts the boards and legs.

Should I use PIR board or mineral wool in the loft?

Mineral wool roll is the usual choice for a loft floor, because there is room for the depth and it fills round the joists. PIR suits rooms in the roof where space is tight; the PIR vs mineral wool guide compares the thickness each needs.

Add this calculator to your website

Running a blog, a contractor site or a class page? You can put this calculator on it for free. Copy the code below, and please leave the link underneath the calculator in place. The small script just resizes the frame to fit the results; if your site strips scripts, the calculator still works inside a scrolling frame.

Get the embed code

Related calculators & guides

Estimates only. Results assume standard materials and simple shapes. Supplier products vary, and the final call on quantity, structure and safety is yours. Check your local code and your supplier's guidance before ordering.