How Much Concrete for a 24x24 Slab?

A 24 × 24 ft slab (576 ft²) poured 4 inches thick is 7.11 cubic yards exact, before waste (320 bags of 80 lb). Order 7.82 cubic yards of ready-mix or 352 bags of 80 lb mix, which adds 10% for spills and an uneven base. That is the figure the calculator below shows; change the thickness for a 5 or 6 inch slab.

Jump to your result ↓

Your project

Patios, walkways and shed pads are usually 4 in. Driveways are usually 5 to 6 in.

%

Forms flex and subgrades are never perfectly level. 5 to 10% is typical.

Results

Example job shown. Change the numbers to match yours.

Concrete needed
7.82 cubic yards
Includes your waste allowance
What to buy
  • 80 lb bags352 bags
  • 60 lb bags470 bags
  • 40 lb bags704 bags
Ready-mix to orderRounded up to the next ¼ yard. Ask your supplier about short-load fees
8.00 yd³
Cubic feet
211.2 ft³
Cubic meters
5.98 m³
Weight of the concrete neededFor the 7.82 yd³ above, at 150 lb per ft³
31,680 lb
Weight of the ready-mix you orderWhat the truck delivers: the order rounded up to the next ¼ yard, at 150 lb per ft³
32,400 lb
  • Assumptions used: 10% waste added; bag yields of 0.3, 0.45 and 0.6 ft³ for 40, 60 and 80 lb bags; 150 lb per ft³ for the weight.
  • Bag yields used: 0.60 ft³ per 80 lb, 0.45 ft³ per 60 lb, 0.30 ft³ per 40 lb. Check your bag, since brands differ slightly.
  • Ready-mix is usually ordered in ¼ yard steps. Round up rather than down.
  • In metric: an 80 lb bag is about 36 kg, a 60 lb bag about 27 kg and a 40 lb bag about 18 kg.

Before you buy: round up to whole packs, check the size printed on the label, and add a little spare. Your supplier has the final say.

Blueprint

24 ft24 ft4 in352 × 80 lb bags10 of 352 shown

7.82 yd³ · 352 bags

Concrete needed for a 24 × 24 ft slab, by thickness

These figures are for the whole 576 ft² slab. The last column adds 10% for waste, which is what we suggest you order.

ThicknessCubic feetCubic yards80 lb bags60 lb bagsYards with 10% waste
4 in192.07.113204277.82
5 in240.08.894005349.78
6 in288.010.6748064011.73
8 in384.014.2264085415.64

What a 24 × 24 slab is used for

A 24 × 24 ft slab is a roomy two-car garage or a large workshop or barn floor. Plan on 5 to 6 inches, reinforcement and thickened edges, designed to your plans and local code.

Bags or ready-mix for 24 × 24 ft?

At 7.82 cubic yards, ready-mix is the sensible choice. Doing it with bags would mean 352 bags (about 14.1 tons of dry mix), which is too much to mix by hand before the first batch starts to set. Ask your supplier about their minimum order and how long you have to unload.

Don't forget what goes under and inside it

A slab needs a compacted base, usually 4 inches of gravel, which for this size is about 8.53 cubic yards after allowing for compaction (see the gravel calculator). Reinforcement such as rebar or wire mesh holds cracks tight: the rebar calculator counts bars for a 24 × 24 ft grid.

Base, reinforcement and joints

At 4 inches thick the finished 24 × 24 slab weighs about 14.4 tons. Under it goes a compacted gravel base: 4 inches is about 8.5 yd³ of stone including 20% for compaction (11.9 tons). A grid of #3 rebar at 16 inch centers takes about 47 bars of 20 ft (353 lb).

Concrete cracks as it shrinks, so cut or tool control joints about 8 to 12 ft apart (a common rule is two to three times the slab thickness in inches, read as feet) to decide where. For this slab that means about 2 joints each way, cut within 24 hours of the pour.

A 24 × 24 floor needs more than one truck

At 6 in the 576 sq ft takes 11.7 cu yd, which is more than the 10 cu yd a standard mixer truck holds. Ordering 2 truckloads means the second truck has to arrive while the first load is still workable, or a cold joint will form where the two meet.

Agree a delivery interval with the supplier and place the two loads so they meet in an area that will be cut with a control joint. Suppliers often add a charge when a truck carries a small load, so splitting the amount evenly between two trucks can avoid it.

Want to change anything else? The calculator above is the full Concrete Calculator: edit any number and the results update instantly.

Tools & materials for this project

Affiliate links As an Amazon Associate we earn from qualifying purchases. These links do not change what you pay.

Frequently asked questions

How many bags of concrete for a 24x24 slab?

For a 4 inch slab you need 320 bags of 80 lb concrete (427 bags of 60 lb), or 352 bags of 80 lb with 10% waste. For a 6 inch slab it is 480 bags of 80 lb, or 528 with 10% waste.

How many cubic yards is a 24x24 slab?

A 24 × 24 ft slab is 7.11 yd³ at 4 inches, 8.89 yd³ at 5 inches and 10.67 yd³ at 6 inches, before waste. Add 5 to 10% when you order.

How much does a 24x24 concrete slab weigh?

At 4 inches thick it weighs roughly 28,800 lb (14.4 tons), at about 150 lb per cubic foot. At 6 inches it is about 43,200 lb.

Related sizes and guides

Estimates only. Results assume standard materials and simple shapes. Supplier products vary, and the final call on quantity, structure and safety is yours. Check your local code and your supplier's guidance before ordering.